Padel Court Specialist Contractor

Precision Padel Court Construction

A contractor specializing in international-standard padel courts, featuring ultra-flat concrete sub-base engineering for consistent ball bounce and an anti-puddling drainage system.

Close-up macro photograph of professional textured green padel turf transitioning to a heavy-duty steel structural joint holding a thick tempered glass wall, bright natural daylight.
Close-up macro photograph of professional textured green padel turf transitioning to a heavy-duty steel structural joint holding a thick tempered glass wall, bright natural daylight.

Technical Specifications

International Precision Standards

The integration of high-safety certified tempered glass and Padel certified synthetic turf ensures structural durability and optimal ball-bounce performance in all weather conditions.

The concrete sub-base system is designed with millimeter-level flatness tolerances to prevent water pooling, supported by a subsurface drainage system tailored to Indonesia's high rainfall.

Work Method

Construction Phases

01
02
03

Soil Test

Structural Calculations

Architectural & Shop Drawings

A technical analysis process to ensure a building can withstand the various loads and forces acting upon it, such as dead loads (material weight) and live loads (people or goods). This analysis determines the appropriate dimensions and materials to ensure the building is safe, sturdy, and structurally sound.

It is the process of creating planning drawings including both structural and architectural working drawings to determine the building's exterior finishing.

This is required to determine load-bearing capacity and predict the depth of hard soil layers. It serves as an initial step to determine the subsequent stages of the project.

04

Budget Plan

To integrate the structural calculation data, working drawings, architectural drawings, and budget plan, a work contract is established between the client and us.

05

Memorandum of Understanding

Memorandum of Understanding

The process of calculating the budget plan to align with the desired costs.

06

Start Build

We will therefore begin construction in accordance with the existing data and agreements, maintaining a very high level of professionalism.